Reuse — the ladder
-
A factorisation kept past its date
One Cholesky factor can serve five members of a drifting sequence and save 44 per cent of the work. Kept for twenty it does not lose accuracy — it stops converging altogether. The optimum and the cliff are four members apart, both move with the drift, and a rule written in a ratio the iteration has already computed finds them without being told what the drift is.
-
Where the drift lands
The standing rule for when a preconditioner has gone stale is to rebuild it once the matrix has changed by more than some fraction of itself. Two drifts of exactly the same relative size cost 19 iterations and 5 on the same matrix, and the quantity that separates them is not in the rule at all — the perturbation is divided by the eigenvalue it lands on.
-
What a rebuild is worth
One sequence, one drift, one preconditioner — and six different right answers, because the cheapest rebuild period depends on what a rebuild cost to build and on nothing else. The optimum walks from every member to every twelfth as the setup gets dearer, and the free rule that reads the iteration count beats it in the middle of that range and loses at both ends.